SH2 Split Speedhead™ System
The SH2 Split Speedhead™ System offers significant time-saving and safety-enhancing advantages over conventional wellheads and is compatible with today's advanced drilling methods. The speedhead is a multi-bowl system, supporting and sealing two strings of pipe in a single head. Safety is improved and installation time reduced by running, landing and sealing the two strings without removing the BOP stack. The system will save approximately 17 hours of rig time: 12 hours of BOP manipulation and 5 hours by using a mandrel hanger/packoff rather than a slip hanger. By using a weldless casing connector (Surelok or LRC), an additional 8 hours can be saved.
Features –
- Field-proven
- Increases safety
- Saves installation time
- Reduces BOP/diverter handling
- Flexible system
- Accepts standard completion equipment
- Mandrel hangers rated to joint strength of suspended casing
- Fluted mandrel casing hanger allows cement returns up through BOP stack

