SCH1 Casing Head
Where risers or rig floor limitations drive you to welding on a conventional casing head, the SCH1 Casing Head is a cost-effective alternative. Run with the surface casing string through the riser and using normal cementing operations, the SCH1 casing head is immediately available for BOP nipple-up when the riser is removed. Eliminating the casing head weld:
- improves safety,
- saves valuable rig time, and
- facilitates multi-well drilling programs from a common location by eliminating "hot" operations.
With the pre-installed pup joint (nipple), no wait-on-cement time and the use of the DVC speed connector, our customers can expect to save in excess of 10 hours of valuable rig time, per well.
Features –
- No welding required to install riser on conductor or the casing head
- No waiting on cement required when running surface casing
- Installed through drilling riser as part of surface casing string
- Allows normal cementing operations including "top-off"
- Field-proven DVC adapter provides safe BOP nipple-up and nipple-down in a few minutes
- Standard W2 bowl profile accepts entire family of W casing hangers
- Accepts all T and MTH2 tubing heads for 3,000, 5,000 or 10,000 working pressures