OSH Offshore Speedhead™ System
The OSH Offshore Speedhead™ System is specifically designed to be compatible with the drilling methods commonly used in the Gulf of Mexico. It has a two-stage starting head, combining the casing head and casing spool into a single housing. The diverter or BOP stack is made up to the starting head before drilling commences and is not removed until two strings of casing have been run.
When combined with the SH2 split speedhead system, this package can save from 24 to 40 hours of valuable rig time.
Features –
- Improved safety
- Field-proven
- Weldless attachment option to drive pipe
- Run annular seals through BOP
- External seal testing/monitoring capability
- Time saving
- Reduces BOP/diverter handling
- Eliminates wait-on-cement time
- Uses simple emergency procedure
- Installs tubing spool with casing spool
- Flexible system
- Allows alternate casing programs
- Has pressure ratings up to 15,000 psi
- Accepts standard tubing hangers with continuous control lines
- Accepts standard casing hangers in the upper bowl and will connect to a conventional tubing head spool for extended casing program
- Accepts conventional casing spool/tubing spool