Home | About | Products | Services | Locations | News | Careers | Contact Us | WG Companies | Login

OSH Offshore Speedhead™ System

OSH

The OSH Offshore Speedhead™ System is specifically designed to be compatible with the drilling methods commonly used in the Gulf of Mexico. It has a two-stage starting head, combining the casing head and casing spool into a single housing. The diverter or BOP stack is made up to the starting head before drilling commences and is not removed until two strings of casing have been run.

When combined with the SH2 split speedhead system, this package can save from 24 to 40 hours of valuable rig time.

Features –

Request More Info