LSH Land Speedhead™ System
The LSH Land Speedhead™ System is designed for use as a two-stage starting head, combining the casing head and casing spool into a single housing. The BOP stack is made up to the starting head before drilling commences and is not removed until two strings of casing have been run. By landing two casing strings in one compact forged housing, the LSH system eliminates one complete BOP nipple-down/nipple-up thereby saving significant rig time and improving safety.
The LSH system offers an economical alternative to the SH2 or SH3 speedhead systems for less demanding applications.
Features –
- Proven technology
- Improved safety
- Light weight/low height
- Intermediate casing landed, locked down and external seal tested without lifting BOP
- Eliminates wait-on-cement time
- Time saving (estimated 17 hours/well compared to conventional wellhead)
- Standard interface with completion equipment
- Flexible casing programs
- Optional hangers for intermediate casing
- Emergency hangers for intermediate casing strings available
- Optional back pressure valve preparation available in the upper LSH mandrel casing hanger
- Available with the S4 Surelok bottom

